Longs Mill, Derby — Rope Access case study

Longs Mill, Derby

DerbyMetropolitan Thames Valley HousingMay 2025

Specialist de-vegetation and parapet rebuild to resolve water ingress on a heritage mill conversion.

Challenge

Leaseholder apartments were suffering significant water ingress from a deteriorating parapet with deeply embedded vegetation — in a hard-to-access location with no scaffolding option.

Approach

The rope team removed extensive vegetation from the parapet, including careful deconstruction of brickwork to extract deeply embedded root systems. The parapet was then rebuilt using specified lime mortar and locally quarried sand to ensure compatibility with the original structure.

Outcome

Parapet restored to its original standard, water ingress resolved, structural integrity preserved — all without disruptive scaffolding or access platforms.

Project specifications.

Substrate
Heritage mill brickwork parapet, Long's Mill (1792)
Mortar
NHL 3.5 hydraulic lime + locally-quarried sand match
Method
Vegetation removal + parapet deconstruction + rebuild
Heritage status
Grade II* listed — earliest surviving cotton mill of its type
Failure mode
Embedded root systems, water ingress to leasehold apartments
Access
IRATA rope from rooftop — no scaffold option viable
Programme
4 weeks on rope
Records
Photographic before/during/after, lime-mix compatibility report