Apex Access Group
Trust. By Design
Staycity Aparthotels, London Heathrow — Rope Access case study

Staycity Aparthotels, London Heathrow

London HeathrowAstley SignsNovember 2025

Two 7.5m illuminated tray signs installed adjacent to live railway infrastructure, delivered in coordination with Network Rail.

Challenge

The building's proximity to an operational train station and live railway ruled out powered access. Restricted ground space and the safety risks of operating adjacent to the railway made conventional methods unsuitable.

Approach

Apex developed a carefully planned rope-access solution, liaising directly with the Network Rail Asset Protection team. Detailed risk assessments and method statements ensured full compliance with rail safety requirements.

Outcome

Two 7.5m illuminated tray signs installed safely and efficiently with no disruption to rail operations or nearby stakeholders.

Talk to our Rope Access team

Contact our Rope Access team today about your project. We aim to respond within 24 hours.

  1. 1Contact
  2. 2Project
  3. 3Details