Snagging at height
Closing out the punch-list at height to the principal's snagging schedule — facade fixings, finishing items, signage rectification, general defect closeout. Photographic record of every item, signed off against your schedule.

Working-at-height access for principal contractors and subcontractors. Apex undertakes the tasks on live construction projects that traditional access — scaffold, MEWPs, mast-climbers — can't reach.
Apex partners with principal contractors and subcontractors on live construction projects to deliver specialist working-at-height tasks where traditional access — scaffold, MEWPs, mast-climbers — isn't a viable solution. Internal atriums and voids, the gap between adjacent buildings, occupied ground floors below working level, river- and canal-side facades with no ground footprint, and short-duration interventions where re-erecting scaffold doesn't add up commercially. Typically these come towards the end of a project, once the external access has been removed.
For principal contractors we close out pre-handover snagging — facade repairs, sealant and gasket defects, glazing snags, signage and finishing items, mastic and sealing on glazing, cladding and expansion joints, post-construction cleaning, and reactive defect remediation after handover. All works are documented in a conclusive report.
For subcontractors we provide rope-access support where your trade — glazing repair, signage installation, MEP penetrations, finishing trades, fire-stopping — needs facade or interior height access that traditional means can't practically deliver. Apex supplies trade-specific, experienced rope-access teams.
Part of Rope Access Division.
Closing out the punch-list at height to the principal's snagging schedule — facade fixings, finishing items, signage rectification, general defect closeout. Photographic record of every item, signed off against your schedule.
Sealant application and replacement on glazing, cladding panels, expansion joints, parapets and balcony interfaces. Approved products to the architect's specification, with installer certificates.
Failed unit replacement, gasket renewal and water-ingress remediation on facade glazing and curtain wall systems. Closed out without re-erecting facade access.
Defective fixings, panel-edge work, weather-damage repair and targeted refit on rainscreen, unitised and composite cladding systems — without scaffold or MEWPs.
Facade, glazing and frame clean-down at the end of a live build, ready for handover. Pure-water systems for streak-free results on glazed elevations.
High-level MEP penetrations and terminations, finishing-trade support, perimeter and penetration fire-stopping. Apex supplies the rope-access leg; the subcontractor keeps ownership of the trade.
Reactive remediation of facade-related defects identified after handover. Sealant failures, fixing loosening, weather damage — closed out without re-erecting access.
Live builds and refurbishments where high-level access is needed but scaffold or MEWP isn't viable — whether you're the principal contractor or a subcontractor on the package.











Rope access install of three illuminated flexface signs at TJ Morris's Doncaster distribution centre: two 17.2m Home Bargains faces and a 10m oval.
Read more
Three high-level illuminated tray signs installed post-construction on a fully occupied building using temporary anchorage.
Read more
Two 3m-high individual flex face letters installed at Revolut's new Canary Wharf office — heavy-lift sections in excess of 900kg, mixed BMU and rope access.
Read more
Annual de-vegetation and brickwork de-scaling on a 13-arch viaduct spanning an active holiday park.
Read more
Critical masonry and concrete repairs to the British Waterways Building's canal-side elevation, delivered entirely on rope.
Read more
Two sets of illuminated built-up lettering installed during the live construction phase, with bespoke temporary anchorage.
Read moreContact our Rope Access team today about your project. We aim to respond within 24 hours.