Apex Access Group
Trust. By Design
FallProtec SecuRail Pro rigid lifeline rail system installed by Apex Access Group

Rigid lifeline rail system · Fallprotec · Made in Luxembourg

FallProtec SecuRail Pro

An anodised-aluminium rigid rail for overhead, ground and wall fall arrest — EN 795 Type D, spans up to 6 m, two users between brackets — installed and certified by Apex as a Fallprotec authorised installer.

What is the FallProtec SecuRail Pro?

SecuRail Pro is Fallprotec's rigid lifeline rail: an anodised-aluminium track with a trolley that follows the user hands-free, certified to EN 795:2012 Type D and CEN/TS 16415:2013, and to ASSP/ANSI Z359.6 and CSA Z259.16. Where a cable lifeline sags and stretches in a fall, a rigid rail barely moves — which is why SecuRail is the system for gantry cranes, loading bays, machine maintenance and any work area with very little fall clearance.

The rail's high inertia allows spans of up to 6 m between brackets with two users between any pair, at 1.7 kg per metre. Fixed on the ground, the ceiling or a wall, it accepts the Granvia trolley for all three orientations and a bi-directional overspeed trolley where the run is inclined. Curved sections, junctions, four-way switches and tilting or fixed end stops let a single system follow a crane runway, turn a corner or branch between bays, and the rail absorbs thermal expansion and contraction along its length.

Fallprotec also makes a SecuRail variant for rope access — a rail along a facade from which technicians suspend — and a vertical version with the MastLadder, both of which Apex installs.

Specifications.

  • EN 795:2012 Type D
  • CEN/TS 16415:2013
  • ASSP/ANSI Z359.6 and CSA Z259.16
System typeRigid lifeline rail — ground, ceiling (overhead) or wall mounted
UsersUp to 2 between brackets
Maximum span6 m between brackets
Weight1.7 kg/m
MaterialAnodised aluminium
TrolleysGranvia (ground, ceiling or wall); bi-directional overspeed trolley
ComponentsCurved rail, junctions, four-way switch, tilting and fixed end stops, 6 m rail lengths
UseFall arrest, fall restraint, work positioning
Made inLuxembourg

Where it suits.

  • Gantry & overhead crane runways
  • Loading bays & truck tops
  • Production lines & machine maintenance
  • Confined-space entry
  • Low fall-clearance work areas
  • Industrial, airport & commercial roofs

How we deliver.

Route & structure survey

We confirm the supporting structure can take the rail brackets at the spans the route needs, and set the mounting orientation — overhead, ground or wall — to how the work is actually done.

Installation to Fallprotec specification

Rail, brackets, curves, switches and end stops fitted by Apex's manufacturer-trained engineers, with expansion allowance set along the run.

Commissioning & handover

Brackets and end stops tested at commissioning; Fallprotec's documentation, Apex's installation certificate, layout drawing and first BS 7883 inspection date handed over.

Annual inspection

BS 7883 periodic inspection and recertification of rail systems, trolleys and end stops, including systems installed by others.

FAQs.

When is a rigid rail better than a cable lifeline?
When there is very little room to fall — a crane runway, a loading bay, a mezzanine — because the rail doesn't deflect the way a cable does, and when a hands-free traverse or several users on one run is needed. A cable lifeline is usually the better value on an open roof with good clearance.
Can SecuRail go round corners or branch between bays?
Yes. Fallprotec makes curved rail for ground and ceiling mounting, junctions, and a four-way switch, so one system can follow a runway, turn a corner or split between work areas.
Is there a version for rope access?
Yes. SecuRail Pro for rope access is a facade-mounted rail that rope access technicians suspend from, giving a permanent, repeatable access route along a building. Apex installs it alongside the fall-arrest version.

Talk to our Fall Protection team about FallProtec SecuRail Pro

Contact our Fall Protection team today about your project. We aim to respond within 24 hours.

  1. 1Contact
  2. 2Project
  3. 3Details