Survey & layout
We confirm the roof build-up, deck and seam profile, map the access route and plant positions, and set out posts and intermediates so the line protects the route people actually walk — not just the perimeter.

Horizontal lifeline system · SFS Group · Made in United Kingdom
A UK-manufactured horizontal lifeline fitted to the outer roof skin — EN 795 Class A and C, up to four users — installed and certified by Apex as an SFS authorised installer.
SOTER II is SFS's horizontal lifeline system: a stainless-steel wire line carried on energy-absorbing posts that fix through the outer skin of the roof, so operatives clip on once and move the full length of the run in fall arrest, work restraint or work positioning. It is made in the UK and tested and certified by SATRA to EN 795:2012 Class A and C and CEN/TS 16415:2013 for up to four users at once.
Two things set it apart on the roof. The high-load post carries an energy-absorbing coil that yields at 4 kN — stiff enough to resist accidental deployment, soft enough to keep the peak load into the roof structure below 6 kN in a fall — and the CE-marked Slyder traveller passes intermediate brackets and corners without the user unclipping. Each post can also be used on its own as a single-point anchor, which simplifies layouts around plant.
SFS pairs the system with its own fixings — thermally broken Metal BS and Timber LBS sleeve-and-fastener systems for built-up flat roofs (no metal bridge through the insulation), BULB-TITE structural rivets for composite panels, and clamps for aluminium rolled, traditional folded and Rivertherm standing seams — which is why it is Apex's first choice on most metal and membrane roofs.
Specifications from SFS Group. Installed and certified by the Fall Protection Division.
| System type | Horizontal lifeline, top-fixed to the outer roof skin; posts usable as single-point anchors |
|---|---|
| Users | Up to 4 |
| Use | Fall arrest, work restraint, work positioning |
| Traveller | CE-marked Slyder — passes intermediate brackets and corners without disconnecting |
| Energy absorption | High-load post with energy-absorbing coil; post yield force 4 kN |
| Peak load to structure | Below 6 kN |
| Materials | Austenitic stainless steel; EPDM or NBR seals |
| Fixings | Metal BS and Timber LBS thermally broken sleeve-and-fastener; BULB-TITE structural rivets; stainless gravity toggle; concrete screws; chemical resin |
| Warranty | 1 + 24 years, subject to conditions and project specification (SFS) |
| Made in | United Kingdom |
We confirm the roof build-up, deck and seam profile, map the access route and plant positions, and set out posts and intermediates so the line protects the route people actually walk — not just the perimeter.
Fitted by Apex's manufacturer-trained engineers using SFS's own fixings for the substrate, with penetrations sealed to the roof manufacturer's detail so the roof warranty is protected as well as the lifeline's.
Every anchor and end post is tested at commissioning. You receive the SFS system documentation, Apex's installation certificate, a layout drawing and the date the first BS 7883 periodic inspection is due.
Apex inspects and recertifies SOTER II systems under BS 7883, including those installed by others, with remedials and genuine SFS replacement parts handled in the same visit.
Contact our Fall Protection team today about your project. We aim to respond within 24 hours.