Case studies.
16 projects across rope access, fall protection and environmental works. Filter by division to narrow the view.

Home Bargains / TJ Morris Distribution Centre, Doncaster
Rope access install of three illuminated flexface signs at TJ Morris's Doncaster distribution centre: two 17.2m Home Bargains faces and a 10m oval.
Read case study
Base 71, Barnsley
Three high-level illuminated tray signs installed post-construction on a fully occupied building using temporary anchorage.
Read case study
Revolut HQ, Canary Wharf
Two 3m-high individual flex face letters installed at Revolut's new Canary Wharf office — heavy-lift sections in excess of 900kg, mixed BMU and rope access.
Read case study
Larpool Viaduct, Whitby
Annual de-vegetation and brickwork de-scaling on a 13-arch viaduct spanning an active holiday park.
Read case study
Castle Wharf, Nottingham
Critical masonry and concrete repairs to the British Waterways Building's canal-side elevation, delivered entirely on rope.
Read case study
Hyatt Place, Leeds
Two sets of illuminated built-up lettering installed during the live construction phase, with bespoke temporary anchorage.
Read case study
True Student, Birmingham
Brand rollout on a fully operational student accommodation building in Birmingham — built-up signage, contra-vision vinyl and large-format banners.
Read case study
Staycity Aparthotels, London Heathrow
Two 7.5m-long illuminated tray signs installed adjacent to live railway infrastructure, delivered in coordination with Network Rail.
Read case study
The Curve Theatre, Leicester
Apex installed aspirating smoke detection pipework across high-level roof voids at Leicester's Curve Theatre using rope access. The work avoided scaffolding costs and maintained the venue's operational schedule.
Read case study
St Peter's Church, Welford-upon-Avon
Lime mortar and masonry repairs to a heritage church tower, delivered without scaffolding to keep church activities running.
Read case study
The Mill, Huntingdon
Masonry, redecoration and timber repairs to a standalone heritage mill with no conventional access options.
Read case study
Leonardo Hotels Re-Brand
Nationwide signage rollout converting the Jurys Inn estate to Leonardo Hotels — flex face, built-up and totem signage across the portfolio.
Read case study
Longs Mill, Derby
Specialist de-vegetation and parapet rebuild to resolve water ingress on a heritage mill conversion.
Read case study
Walcott Hall, Stamford
Restoration of original timber sash windows on a Grade I listed hall, delivered while the building continued to host events.
Read case study