Project portfolio
Case studies.
14 projects across rope access, fall protection and environmental works. Filter by division to narrow the view.
Waste Facility Roof Access, Sutton-in-Ashfield
Installation of a 7.2 m fixed caged ladder to give safe roof access, plus a 70 m horizontal lifeline run across the metal roof as a work-restraint system for safe gutter maintenance.
Read case studyRevolut HQ, Canary Wharf
Two 5m flex face letters installed at Revolut's global HQ — heavy-lift sections in excess of 900kg, mixed BMU and rope access.
Read case studyLeonardo Hotels Re-Brand
Nationwide signage rollout converting the Jurys Inn estate to Leonardo Hotels — flex face, built-up and totem signage across the portfolio.
Read case studyWalcott Hall, Stamford
Restoration of original timber sash windows on a Grade I listed hall, delivered while the building continued to host events.
Read case studyHyatt Place, Leeds
Four sets of illuminated built-up lettering installed during the live construction phase, with bespoke temporary anchorage.
Read case studyTrue Student
Multi-site brand rollout across student accommodation buildings — built-up signage, contra-vision vinyl and large-format banners.
Read case studyStaycity Aparthotels, London Heathrow
Two 7.5m illuminated tray signs installed adjacent to live railway infrastructure, delivered in coordination with Network Rail.
Read case studyBase 71, Barnsley
Three high-level illuminated tray signs installed post-construction on a fully occupied building using temporary anchorage.
Read case studyCastle Wharf, Nottingham
Critical masonry and concrete repairs to the British Waterways Building's canal-side elevation, delivered entirely on rope.
Read case studySt Peter's Church, Stratford-upon-Avon
Lime mortar and masonry repairs to a heritage church tower, delivered without scaffolding to keep church activities running.
Read case studyLarpool Viaduct, Whitby
Annual de-vegetation and brickwork de-scaling on a 13-arch viaduct spanning an active holiday park.
Read case studyLongs Mill, Derby
Specialist de-vegetation and parapet rebuild to resolve water ingress on a heritage mill conversion.
Read case studyThe Mill, Huntingdon
Masonry, redecoration and timber repairs to a standalone heritage mill with no conventional access options.
Read case studyThe Curve Theatre, Leicester
Apex installed aspirating smoke detection pipework across high-level roof voids at Leicester's Curve Theatre using rope access. The work avoided scaffolding costs and maintained the venue's operational schedule.
Read case study